Run your QAP review programme

The QAP review programme is the school's own audit calendar: a checklist of review items, a schedule of when each falls due, and a completion record with findings and corrective actions. Seed the default checklist, generate the year's schedule, then complete each review as it comes up.

Updated 2026-08-05

Quick answers

Where is the QAP section?

Sidebar → Compliance → QAP, at /school/admin/qap. Its children are Dashboard, Audit Readiness, Reviews, Safety Meetings, First Aid Kits, SIRS Log, Annual Report and Settings.

How do I get started with QAP?

Seed the default checklist, then generate this year's schedule. Both are buttons on the QAP Dashboard (Seed Defaults and Generate Schedules), and QAP → Audit Readiness offers the same two as one-click fixes on its findings.

What does the QAP Dashboard show me?

For the current quarter: Total Reviews, Completed (with a percent), Overdue and Open SIRS. Below that, Upcoming Reviews and Overdue Reviews (each with a Complete shortcut), Recent SIRS Entries, and the current year's Annual Activity Report status. A review that has gone past its due date counts as overdue immediately — you do not have to wait for the nightly job to relabel it.

What is in the default checklist?

Ten items: Certificate and operations specification review; Student files; Instructor files; Incident and accident reports; Safety occurrences; Theory training review; Practical training review; SIRS Log review; Aircraft review and airworthiness; Equipment review.

Is seeding safe to re-run?

Yes, but it is all-or-nothing: if any review item already exists it does nothing and answers "Review items already exist".

Where do I edit the checklist?

QAP → Settings → Review Items (page title "QAP Review Items", subtitle "Configure the review items for your QAP program"). Each item has a Name, Category, Frequency, Quarters and Active status.

What are the categories and frequencies?

Categories: Files, Reports, Training, Equipment, Certificates, Safety, Operations. Frequencies: Quarterly, Annually, Semi-Annually.

How does schedule generation work?

For each active review item: an annual item gets one schedule due at the end of Q4; a quarterly or semi-annual item gets one per quarter listed on the item. Existing rows are skipped, so re-running only fills gaps. Due dates are the calendar quarter-ends — 31 March, 30 June, 30 September and 31 December.

Can I change my quarter-end dates?

No. The scheduler always uses calendar quarter-ends and there is no per-school override. QAP Settings states the fixed dates rather than offering a setting.

Where do I complete a review?

QAP → Reviews. The list shows Review Item, Period, Due Date, Status, Completed and a Complete button on anything not yet completed. It sorts by due date and filters by Year, Quarter and Status.

What do I fill in when completing a review?

Review Date, Status (Satisfactory / Requires Action / Critical), Findings, and — when action is needed — Corrective Actions and an Actions Due Date, plus optional Additional Notes. Press Complete Review.

What happens to an overdue review?

Its status flips to Overdue and Audit Readiness raises a critical finding naming the item, the period and the due date. An unclosed corrective action past its due date is a second critical finding.

What is the Annual Activity Report?

QAP → Annual Report — a per-year record for regulatory submission. Pick a year, press Generate Report, then Finalize, then record the Authority Reference (Optional) once the authority acknowledges it.

Where do the Annual Report's numbers come from?

They are computed from your records for that year, not typed in. Training Courses counts course runs that finished in the year; Students Trained counts distinct students on those runs (excluding refreshers, which get their own count); Incidents and Accidents come from the SIRS Log by occurrence date. Refresh Data re-runs the whole calculation.

How do I get the PDF?

Finalising the report renders it. Download PDF opens it — and if no PDF exists yet (for example an older report finalised before the renderer existed), pressing the button renders one on the spot.

Steps

  1. Open QAP → Audit Readiness and press Seed default checklist.
  2. Adjust the checklist under QAP → Settings → Review Items — rename items, change frequency or quarters, or deactivate ones that do not apply.
  3. Back on Audit Readiness, press Generate schedules for the current year.
  4. Work the calendar from QAP → Reviews: press Complete on each review as it falls due and record the findings.
  5. Where a review raises a corrective action, set an Actions Due Date and come back to record its completion — an unclosed action is an audit finding.
  6. At year end, generate and finalise the Annual Report.

Known limitations

  • Quarter-ends are not configurable. Every school's reviews fall due on 31 March, 30 June, 30 September and 31 December; annual items are due at the end of Q4.
  • A finalised or submitted Annual Report is frozen. Generating again returns it untouched — deliberate, so the figures cannot drift away from what was signed off, but it means a correction needs the report re-opened by support.
  • Marking a review complete does not attach evidence in the UI — the record supports evidence documents and a signature, but the completion form does not collect them.
  • Seeding the checklist is all-or-nothing. If a single review item already exists, seeding does nothing rather than filling the gaps.