# Run your QAP review programme

The QAP review programme is the school's own audit calendar: a checklist of review items, a schedule of when each falls due, and a completion record with findings and corrective actions. Seed the default checklist, generate the year's schedule, then complete each review as it comes up.

Source: https://help.pigi.io/guides/compliance/qap/qap-reviews

## Quick answers

**Where is the QAP section?**
Sidebar → **Compliance → QAP**, at /school/admin/qap. Its children are Dashboard, Audit
Readiness, Reviews, Safety Meetings, First Aid Kits, SIRS Log, Annual Report and
Settings.

**How do I get started with QAP?**
Seed the default checklist, then generate this year's schedule. Both are buttons on the
**QAP Dashboard** (**Seed Defaults** and **Generate Schedules**), and **QAP → Audit
Readiness** offers the same two as one-click fixes on its findings.

**What does the QAP Dashboard show me?**
For the current quarter: Total Reviews, Completed (with a percent), Overdue and Open
SIRS. Below that, Upcoming Reviews and Overdue Reviews (each with a **Complete**
shortcut), Recent SIRS Entries, and the current year's Annual Activity Report status.
A review that has gone past its due date counts as overdue immediately — you do not have
to wait for the nightly job to relabel it.

**What is in the default checklist?**
Ten items: Certificate and operations specification review; Student files; Instructor
files; Incident and accident reports; Safety occurrences; Theory training review;
Practical training review; SIRS Log review; Aircraft review and airworthiness; Equipment
review.

**Is seeding safe to re-run?**
Yes, but it is all-or-nothing: if any review item already exists it does nothing and
answers "Review items already exist".

**Where do I edit the checklist?**
**QAP → Settings → Review Items** (page title "QAP Review Items", subtitle "Configure the
review items for your QAP program"). Each item has a Name, Category, Frequency, Quarters
and Active status.

**What are the categories and frequencies?**
Categories: Files, Reports, Training, Equipment, Certificates, Safety, Operations.
Frequencies: Quarterly, Annually, Semi-Annually.

**How does schedule generation work?**
For each active review item: an annual item gets one schedule due at the end of Q4; a
quarterly or semi-annual item gets one per quarter listed on the item. Existing rows are
skipped, so re-running only fills gaps. Due dates are the calendar quarter-ends —
31 March, 30 June, 30 September and 31 December.

**Can I change my quarter-end dates?**
No. The scheduler always uses calendar quarter-ends and there is no per-school override.
QAP Settings states the fixed dates rather than offering a setting.

**Where do I complete a review?**
**QAP → Reviews**. The list shows Review Item, Period, Due Date, Status, Completed and a
**Complete** button on anything not yet completed. It sorts by due date and filters by
Year, Quarter and Status.

**What do I fill in when completing a review?**
**Review Date**, **Status** (Satisfactory / Requires Action / Critical), **Findings**,
and — when action is needed — **Corrective Actions** and an **Actions Due Date**, plus
optional **Additional Notes**. Press **Complete Review**.

**What happens to an overdue review?**
Its status flips to Overdue and Audit Readiness raises a critical finding naming the
item, the period and the due date. An unclosed corrective action past its due date is a
second critical finding.

**What is the Annual Activity Report?**
**QAP → Annual Report** — a per-year record for regulatory submission. Pick a year,
press **Generate Report**, then **Finalize**, then record the **Authority Reference
(Optional)** once the authority acknowledges it.

**Where do the Annual Report's numbers come from?**
They are computed from your records for that year, not typed in. Training Courses counts
course runs that finished in the year; Students Trained counts distinct students on those
runs (excluding refreshers, which get their own count); Incidents and Accidents come from
the SIRS Log by occurrence date. **Refresh Data** re-runs the whole calculation.

**How do I get the PDF?**
Finalising the report renders it. **Download PDF** opens it — and if no PDF exists yet
(for example an older report finalised before the renderer existed), pressing the button
renders one on the spot.

## Steps

1. Open **QAP → Audit Readiness** and press **Seed default checklist**.
2. Adjust the checklist under **QAP → Settings → Review Items** — rename items, change
   frequency or quarters, or deactivate ones that do not apply.
3. Back on Audit Readiness, press **Generate schedules** for the current year.
4. Work the calendar from **QAP → Reviews**: press **Complete** on each review as it
   falls due and record the findings.
5. Where a review raises a corrective action, set an **Actions Due Date** and come back
   to record its completion — an unclosed action is an audit finding.
6. At year end, generate and finalise the **Annual Report**.

## Known limitations

- **Quarter-ends are not configurable.** Every school's reviews fall due on 31 March,
  30 June, 30 September and 31 December; annual items are due at the end of Q4.
- **A finalised or submitted Annual Report is frozen.** Generating again returns it
  untouched — deliberate, so the figures cannot drift away from what was signed off, but
  it means a correction needs the report re-opened by support.
- **Marking a review complete does not attach evidence in the UI** — the record supports
  evidence documents and a signature, but the completion form does not collect them.
- **Seeding the checklist is all-or-nothing.** If a single review item already exists,
  seeding does nothing rather than filling the gaps.

## Related

- [Check whether you are audit ready](audit-readiness.md)
- [Safety meetings, SIRS and first-aid kits](qap-safety-records.md)
